Joined May 2012
·

Rafael Masoni

Designer, developer, illustrator at Current
·
São Paulo, Brazil
·
·
·

Posted to Schedule meetings like a boss over 1 year ago

Aren't the empty spaces the time when the developers would be coding and the black dots when they push the commits?

That'd mean the black dots represent the time right before they are done with what they were doing and thus the optimal time for a meeting.

Achievements
29 Karma
0 Total ProTip Views